Bicentennial Park Pathway - Connecting Creasey Bicentennial Park to the Grand Blanc Road Pathway on the South and Hill Road to the North. 2.9 Miles.
Grand Blanc Road Pathway - Connects Bicentennial Park Pathway with the City of Grand Blanc. 1.6 Miles.
Iron Belle Trail M54 Section - Between Gibson Street and Edwards Street. 0.4 Miles.
Dort Highway Pathway - Between Baldwin Road and Pollock Road. Trailhead located on the West side of the road. When completed the path will be a mile between Baldwin and Cook. Currently the path connects with the Genesys walking path and will connect with future pathways on Baldwin Road to the South and Cook and Embury to the North.